Customer Success Stories

See how leading organizations achieved seamless cloud migrations with MigroStack

Global Financial Services Corp

Fortune 500 Financial Services • 25,000 employees

15 TB
Data Migrated
99.97%
Success Rate
48hrs
Migration Time
$2.3M
Cost Savings

Challenge

Global Financial Services Corp needed to merge two SharePoint tenants following a major acquisition. The migration involved 15 TB of highly sensitive financial data, 25,000 user mailboxes, and strict compliance requirements including SOC 2, FINRA, and GDPR.

Key challenges included:

  • Zero tolerance for data loss or security breaches
  • Complex permission structures across 500+ SharePoint sites
  • Minimal downtime requirement (less than 4 hours)
  • Regulatory compliance and audit trail requirements
  • Integration with existing identity management systems

Solution

MigroStack implemented a phased migration approach using delta sync technology to ensure zero downtime. The solution included:

  • Pre-migration validation: Automated scanning identified and resolved 1,200+ potential issues before migration
  • Intelligent user mapping: AI-powered matching automatically mapped 98% of users between tenants
  • Incremental migration: Delta sync kept data synchronized while users continued working
  • Security compliance: Bank-level AES-256 encryption with complete audit logs
  • Dedicated support: 24/7 migration engineer on standby throughout the project

Results

The migration was completed 3 days ahead of schedule with exceptional results:

  • ✓ 15 TB of data migrated in 48 hours
  • ✓ 99.97% success rate (only 43 items required manual intervention)
  • ✓ Zero security incidents or data breaches
  • ✓ $2.3M saved compared to competitor quotes
  • ✓ 100% compliance with regulatory requirements
  • ✓ All 25,000 users productive on day one

"MigroStack exceeded our expectations. The migration was flawless, and the cost savings were substantial. Our compliance team was particularly impressed with the comprehensive audit trails and security controls."

Sarah Chen — VP of IT Infrastructure

SharePoint Migration Tenant-to-Tenant Financial Services FINRA Compliance Delta Sync

MediCare Health Systems

Healthcare Provider • 12,000 employees • 45 locations

8.5 TB
Patient Records
100%
HIPAA Compliant
72hrs
Total Migration
Zero
Downtime

Challenge

MediCare Health Systems needed to migrate from on-premises SharePoint 2016 to SharePoint Online while maintaining HIPAA compliance and ensuring zero downtime for critical patient care systems.

Critical requirements:

  • Migration of 8.5 TB of protected health information (PHI)
  • HIPAA Business Associate Agreement (BAA) required
  • 24/7 availability for emergency department access
  • Migration from 45 different locations with varying network speeds
  • Integration with existing Epic EMR system

Solution

MigroStack deployed remote agents at all 45 locations with HIPAA-compliant encryption:

  • Remote agents: Installed at each location to optimize bandwidth usage and ensure security
  • Encryption: End-to-end encryption for all PHI during transfer
  • Delta sync: Continuous synchronization to eliminate downtime
  • Compliance: Executed HIPAA BAA and maintained complete audit logs
  • Validation: Automated integrity checks for all patient records

Results

  • ✓ 8.5 TB of PHI migrated securely in 72 hours
  • ✓ Zero downtime for clinical operations
  • ✓ 100% HIPAA compliance maintained throughout
  • ✓ All 45 locations successfully migrated
  • ✓ Complete audit trail for regulatory review
  • ✓ $850K annual savings on infrastructure costs

"Patient care never stopped during our migration. MigroStack's expertise in healthcare compliance and their remote agent technology made what could have been a nightmare into a seamless transition."

Dr. Michael Rodriguez — Chief Information Officer

On-Premises to Cloud Healthcare HIPAA Compliance Remote Agents Zero Downtime

TechVenture Inc

SaaS Startup • 450 employees • Series C

2 TB
Data Volume
89%
Cost Reduction
24hrs
Migration Time
450
Users Migrated

Challenge

Fast-growing SaaS startup needed to migrate from Google Workspace to Microsoft 365 after being acquired by a larger enterprise organization. The migration had to happen quickly during a weekend window.

Key requirements:

  • Migrate Gmail to Exchange Online for 450 users
  • Transfer Google Drive to OneDrive and SharePoint
  • Maintain access to Slack until Teams migration complete
  • Complete migration in 48-hour window
  • Minimal business disruption (startup operates 24/7)

Solution

MigroStack executed a rapid weekend migration with parallel processing:

  • Parallel migration: Simultaneous Gmail and Google Drive migrations
  • Auto user mapping: Intelligent mapping based on email addresses
  • Label conversion: Gmail labels automatically converted to Outlook folders
  • Pre-configured Outlook: All users had Outlook pre-configured for Monday morning
  • Training materials: Custom guides for Microsoft 365 transition

Results

  • ✓ Complete migration finished in 24 hours (50% faster than planned)
  • ✓ All 450 users productive Monday morning
  • ✓ 89% cost savings vs MigrationWiz quote
  • ✓ Zero data loss across 2 TB of content
  • ✓ 97% user satisfaction score
  • ✓ Seamless integration with parent company systems

"MigroStack turned what we thought would be a multi-week project into a single weekend migration. The cost savings alone paid for our first year of Microsoft 365 licenses."

Alex Thompson — Director of IT Operations

Google Workspace Gmail to Exchange Startup Fast Migration Cost Savings

Industrial Manufacturing Co

Global Manufacturing • 8,500 employees • 32 countries

45 TB
File Shares
32
Countries
120
Remote Agents
14 days
Total Duration

Challenge

Global manufacturer needed to migrate decades of engineering files and CAD drawings from aging on-premises file servers to SharePoint Online across 32 countries with varying network infrastructure.

Complex requirements:

  • 45 TB of legacy files dating back to 1995
  • 120 different file servers across global locations
  • Limited WAN bandwidth in developing regions
  • Preservation of complex NTFS permissions
  • Large CAD files (some over 5 GB)
  • 24/7 manufacturing operations requiring constant file access

Solution

MigroStack deployed 120 remote agents globally with intelligent bandwidth management:

  • 120 remote agents: One agent per file server location
  • Bandwidth throttling: Automatic adjustment based on business hours
  • Large file handling: Special chunking for CAD files over 1 GB
  • Permission mapping: NTFS ACLs mapped to SharePoint permissions
  • Staged migration: Region-by-region rollout over 14 days
  • Local support: 24/7 support in multiple languages

Results

  • ✓ 45 TB successfully migrated from 120 file servers
  • ✓ 99.94% success rate across all locations
  • ✓ Zero production downtime
  • ✓ All NTFS permissions preserved
  • ✓ $1.8M annual savings on file server maintenance
  • ✓ Improved collaboration between global teams
  • ✓ CAD files accessible from anywhere via OneDrive sync

"Managing 120 file servers across the globe was a nightmare. MigroStack's remote agent technology and support team made this massive migration feel effortless. Our engineers now access files faster than ever before."

Johann Schmidt — Global IT Director

File Share Migration Manufacturing Global Deployment Remote Agents Large Files

Ready to Join Our Success Stories?

Start your cloud migration journey today with MigroStack

Start Free Trial